Projects

Qualifications:

Under contract and completed Projects by

Wells & Water Systems, Inc.

Robert J. Kohlmeier and/or Employees

 

Work completed for various Towns, Villages, Counties, Agricultures, Municipalities, State and Federal Agencies. List of Engineers, phone numbers and contacts

 

Project References List

 

In Progress

 

Miscellaneous Projects 2024

 

Wells, pumps, well rehabilitation, acidization w/HCL, Acidization W/Co2, PWS Wells, Monitor Wells, MITs, Geophysical Logging, ASR Wells, Irrigation Wells, Well Abandonment and all phases of the water well industry.

 

            Lee County

            City of Arcadia

            Collier County

            Sarasota county

            Charolette County

            Army Corps

            SFWMD

            SWFWMD

 

City of Venice/Andrews Sitework Start February 2024

            Set 40-feet of 34-inch steel casing & cement in place

            Drill pilot hole to 140-feet

Conduct geophysical logging

Ream hole to 32-inch

Set 140-feet of 24-inch steel & cement in place

Drill pilot hole to 250-feet

Geophysical logging

Ream hole to 250-feet

Set 250-feet of 14-inch SDR-17 Well casing

Cement in place

Drill bottom borehole by reverse air to 333-feet BLS

Air & pump development

Pump test

Set final pump

 

           

Gateway Services District Start February 2024

            Build Road & Pad

            Set 40-feet of 34-inch steel & grout in place

            Drill pilot hole with mud to 240-feet

            Geophysical Logging

            Ream hole to 240-feet

Set 240-feet of 24-inch steel & grout in place

Pilot hole to 700-feet

Geophysical logging

Ream hole to 24-inch & log well

Set 700-feet of 14-inch SDR 17

Cement in Place

Drill by reverse air to 850-feet BLS

Conduct Geophysical Logging with Video

Pump test

Install permanent Pump

                               

Pine Island Fish Farm 50% Complete

RMA Geologic Consulting

Drill One Deep Salt Water Well

 Set 60-feet of 26-inch Steel

 Drill 25-inch borehole to 620-feet BLS

 Set 610-feet of 16-inch steel

 Pilot hole to 1,900-feet BLS

Ream hole to 15-inches Reverse Air

Set 1,600-feet of 8-inch FRP well casing

Cement in Place

Drill bottom borehole to 1,900-feet by reverse air

Develop Well

 

Miscellaneous Projects 2023 Completed

·         16-inch Fire Well South Naples

·         16-inch Fire Well SE Naples

·         Well Rehabilitation Projects in SW Florida

           

The Colony Golf Course 2023 Completed

·         Drill one six inch Screened well

·         Develop Well

·         Install Pump

 

Bonita Springs Utilities in Progress Phase 3 Through 2023

·         Drill 12 Wells 95% Complete

·         Set 20-feet of 34-inch surface casings

·         Pilot hole to 150-feet BLS

·         Geophysical Logging

·         Ream hole to 32-inches

·         Geophysical Logging

·         Set 26-inch .375 steel casing & cement in place

·         12-inch pilot hole to 820-feet BLS

·         Geophysical logging

·         Ream hole to 25-inches to 820-feet BLS

·         Geophysical logging

·         Set 16-inch SDR-17 PVC well casing

·         Cement in place with 1,200 sacks of cement

·         Drill to 1,100-feet BLS by Reverse Air Drilling Method

·         Conduct Pre-Acid Step Test

·         Acidize wells

·         Conduct Post Acid Step Pump Test

·         Disinfect and Bacterial Samples

 

Collier County November 2022

Well Acidification & Well Rehabilitation of Six Wells

·         Remove owner’s pump

·         Conduct pre-pump test

·         Suppress flow with salt

·         Install acid line

·         Pump Acid

·         Remove acid lines

·         Air develop

·         Pump develop

·         Post step pump test

·         Disinfect

·         Re-install owners pump

·         Bactee samples

 

2022

Water Science /Army Corp of Engineers Monitoring Wells CERP Indian River

Contact Rahul John On Hold

·         Lagoon South C-23/24 Canal

·         Plug and abandon 9/wells

·          Drill 9/new wells

 

2022

Water Science Marco Island Marco Marriott

Contact Andy McThenia

·         Plug and abandon one injection well

·          one supply well and one monitor well

 

2022

Bonita Springs Utilities

Contact Omar Rodriguez

·         Drill 9/wells with 32-inch surface casing,

·         24-inch intermediate casing

·         800-feet of SDR-17 Certa-Lok PVC casing

·          drilled to a depth of 1,100-feet

·         packer test, pump test and acidification

 

2022 Florida Design Drilling South Florida Water Management District

 

·         Drill 24-inch diameter well to approximately 1,100 feet deep.

·          Packer test,

·         Cores, pump test & Lab analysis

 

 

2021    SFWMD                                                                     Completed

            Monitor Well

·         50-feet of 12-inch surface casing

·         325-feet of final casing

·         Drilled to 475-feet BLS

·         Developing & Testing

 

2021    WSA Consulting City of Naples                             Completed

            Andy McThenia Kirk Martin 239-246-1972

·         4-Well Co2 Rehabilitation

·         Pre-pump Test

·         Remove pump & Piping

·         Install well acid header and trimmie line

·         Install 4,000 pounds of Co2 over 80-hour period

·         Develop Well

·         Reinstall pump and piping

·         Conduct post test

·         Video well before & after treatment

 

2021    Island Water Association WSA Consulting Well H-10    Completed

            Andy McThenia 239-246-1972

·         Pre-Pump Test

·         600-Foot Deep 10-inch Well

·         Remove Pump

·         Install Inflatable Packer

·         Install Acid Header and Trimmie Line

·         Install High Strength HCL 32%

·         Remove Spent Acid

·         Develop well

·         Reinstall pump & Piping

·         Post Test

2021    City of Cape Coral                                                                Completed

            Public Water Supply Well

            RMA Geologic Consulting

·         30-inch Bore-hole

·         24-inch surface casing

·         12-inch final casing

·         800-Feet Deep

·         Testing

·         Acidization w/packer

 

2020    Collier County

Project: Emergency Well Abandonment

Contact:  Pamela Libby

           

·         6 inch Artesian Well 460 feet dept

·         Install trimming lime to 460 feet below land surface

·         Cement from bottom to land surface

 

2020    Collier County Phase 4A

Project: Two 16 Inch Wells 800 feet deep Water Supply Wells

Contact:  Tom Sivert (239) 252-8407 WSA Andy McThenia 239-246-1972          

·         Pre and Post Pump test

·         Install Acid well head and tubing,

·         HCI well Acidifications

·         Public Water Supply Well

·         Pull and replace Pumps

·         Pre-Post Pump Test

·         Air and Pump Development

·         Bacteriological  Sampling

 

2021    Collier County Phase 4

Project: Well and Pump Repair-

Acidification of 12-Wells Public water Supply Wells GG Wellfield

Contact:  Tom Sivert (239) 252-8407 WSA Consultants Andy McThenia 239-246-1972  

·         Acidification  of 12 Wells  

·         Public Water Supply Well

·         Pull and replace Pumps 12

·         Pre-Post Pump Test

·         Install Acid well head and tubing,

·         Installed CO2 or HCI

·         Air and Pump Development

·         Bacteriological  Sampling

 

2020    Island Water Association Sanibel Island FL. Well H-14

·         Acidification of Deep well

·         PWS

·         Pump Test Development

·         Install New Pump

 

2020 Island Water Association Well 10 Pipe Rep 

 

·         Well Head repair

·         316 Stainless steal Piping and Fittings

·         Acidification of Deep well (scheduled for 2021)

·         Public Water Supply   

 

2020    Collier County 12                 

Contact: Mitchell Stark-Michael Westhafer (239) 332-1632

·         Well B plug and Well Abandonment 

·         Pump Removal and Reinstalling Well Heads

·         Trimmer line, Slab- Electric

 

2020    Collier County

Project: Well 39

Contact:  Mitchell Stark – Michael Westhafer (239) 332-1632       

·         Install new 12 inc Fiber glass Production well

·         Air and Pump Development

·         Well Testing , Lab Testing Primary and Secondary

 

2020    Colony Golf & Country Club                                             

Project: Colony Submersible Pumps - 3rd phase

Contact: Jeff Price                  

·         Pump Removal and Reinstalling 240 Volts 3 phase 

·         Electric wire –Accessioning

·         Restore - New valves fittings

·         Run floats clean conduit lines, Well Logging

 

2020    Collier County                      

Orange Tree Water Plant   

Project: Wells B (Oil Well Road)   

Contact: Mitchell Stark-Michael Westhafer (239) 332-1632

·         Well B plug and Well Abandonment 

·         Pump Removal and Reinstalling Well Heads

·         Trimmer line, Slab- Electric

 

2020    Collier County Orange Tree Water

Plant Public Utilities

Contract: 15-6469

Project: Wells A, B, E

Contact: Management and Planning Div.-Tom Sivert (239) 252-5376

·         Acidification  Production Wells

·         Well Rehabilitation

·         Pump Removal and Reinstalling Well Heads

·         Well Air Develop

·         Estep Test Conduit, Restore - New Piping- Pump Testing

2020    County Board of Commissioners

Contract: 18-7483

Project: SCWRF Blowers Collier

Contact: Matt Casey mcasey@qeusa.com Quality Enterprise

·         Well Rehabilitation

·         Pump Removal and Reinstalling Well Heads

·         Well Air Develop

·         Air Blower Replacement

·         New piping

 

2019    Collier County                                                                                                                       City of Golden Gate Well Abandonment                                                   

Project Number: 15-6469

Contact: Dustin Grossenbaugh (239) 465-1402

·         Well Abandonment

·         8 inch Production wells

·         16 inch Production Wells

·         Well Logging

·         Video Logs

·         Well depths from 20 feet to 250 feet

·         Total Well Abandonment  21 wells

 

2019    Collier County                                                                                              

Golden Gate Wellfield 3nd Phase

Project Number: 70085.19.2

Contact: Joshua BauerJoshua.Bauer@colliercountyfl.gov (239) 252-6245

·         Acidification  of 12 Production Wells

·         Well Rehabilitation

·         Pump Removal and Reinstalling Well Heads

·         Well Air Develop

·         Restore - New Piping- Pump Testing

·         Well Logging

 

2019    South Florida Water Management District                                               

Palm Bay / Okeechobee                               

Project Wellhead Repair of PBF-7

·         2,040 feet deep dual zone Monitor well

·         Project Manager Keith Smith 561-682-6804

·         Salt Down  both zones deep high pressure zones

·         Replace wellhead, valves, concrete & fence

·         Bring the dual zones back

·         Take out old steel and replace with Stainless Steel

 

 

2019    Cape Coral

Project: 8 Monitor Wells

Contact: Jeff Pearson City of Cape Coral 239 574-0709

239 415-1818 Cape Coral RE Division 

·         Drill 4 inch Monitor Wells

·         Well Air Develop

·         New Piping- Pump Testing

 

2019    Collier County

2018    Project: Golden Gate Wellfield 2nd Phase Collier County

Contact: W. Kirk Martin, P.G. 239.204.5301

239.218.1043 kirk@wsaconsult.com

Joshua Bauer Joshua.Bauer@colliercountyfl.gov

·         Acidizing  8  Production Wells

·         Well Rehabilitation

·         Pump Removal and Reinstalling Well Heads

·         Restore - New Piping

·         Pump Testing

 

2018    Collier County

2017    Project: SRO Project

Contact: Project Mng. Matt Casey 239-633-0555 Quality Enterprises

·         Salt Down Deep Flowing Wells (New Valves, Backflow, Gaskets)

·         Bolts (spacers, spool pieces)

·         Remove Salt & Bacterial Clearances

 

2019    Collier County                                                                        

2018    Project: Mule Penn Wellfield Improvement-Collier County

Contact: John H Eick

·         Replace 6 pumps, piping

·         Replace and repair piping

·         Electrical improvements

·         Instrumentation and controls 

 

2019    Collier County                                              

2018    Project: Golden Gate Wellfield Testing Maintenance

Contact: W. Kirk Martin, P.G. 239.204.5301 – 239.218.1043 kirk@wsaconsult.com  Joshua Bauer Joshua.Bauer@colliercountyfl.gov

·         Acidizing  2  Deep Production Wells

·         Well Air Test

·         Well Rehabilitation

·         Pump Removal and Reinstalling Well Heads

·         Restore - New Piping

·         Pump Testing Well

 

2018    Sanibel Inland Well –IWA H-14

Contact: Andy McThenia 239-529- 4399

·         Well Rehabilitation

·         Pump Removal  Well Heads Reinstallation

·         Well acidizing

·         Restore  New Piping and Site Cleaning

·         Conduct Specific Capacity

·         Drawdown Test Pump Development

 

2018    Old Collier County

Project: Old Collier Golf Club Well LH-1 Ac Rehab

Contact: Water Science Associates - Kurt Martin

·         Well Rehabilitation

·         Pump Removal and

·         Reinstalling Well Heads

·         Well Acidizing, Site Restoration   

·         Conduct Specific Capacity

·         Drawdown Test Pump Development

 

2018    Collier County- Well Rehabilitation          

Project: NESA Orange Tree

Contact: Swainson, Hall, Proc Mng. 239-252-8932 and 252-6334

swainsonhall@colliergov.net

·         Well Rehabilitation Develop Open Hole

·         Conduct Specific Capacity and Steps Drawdown Test

·         Pump Development and Reinstallation

·         Disconnection and Assist in Bacteriological Clearance

 

2018    Colony Country Club                                              

Project: Well Rehabilitation Project

Contact: Jeff, Price Project Manager 239 278-1177

·         Drill Pilot Hole

·         Well Development

·         Drill and Install 16 inch Casing

·         Air Develop

·         Conduct Specific Capacity and Steps Drawdown Test

·         Piping - Installation of New Electric Boxes

 

2018    Bonita Springs Utilities

Project: Well Rehabilitation Project                                                         

·         Salt Down 6 Wells

·         Installation of New Pumps

·         Well Development

 

 

 

 

Well Abandonment and Well Rehabilitation Projects Competed by

Wells &Water Systems, Inc.

Robert J. Kohlmeier and/or Employees

 

 

 

Bonded Job as a Prime Contractor:

 

Ø  South Florida Water Management District 

Ø  City of Cape Coral

Ø  City of Fort Myers

Ø  Lee County (cleaning and abandonment of an old Oil well approximately 2500 feet deep)

Ø  City of Ormond Beach

Ø  Verna Well Field , Sarasota (1,000 feet deep)

Ø  Sanibel Inland

 

Contractors:  

 

Ø  City of Cape Coral

Ø  City of Naples

Ø  Gulf Utilities

Ø  Harbor Heights Water Associates

Ø  Indian Reservation

Ø  Ocean reef Club

Ø  Sanibel Island

 

Agriculture Work throughout Florida:  

 

Ø  Alico Inc.

Ø  Baron Collier

Ø  Collier County

Ø  Dole Pinnacle

Ø  USDA

Ø  US Sugar

Additional information on others wells completed in the last five years throughout the state of Florida. Details are available upon request.