Projects
Qualifications:
Under contract and completed Projects by
Wells & Water Systems, Inc.
Robert J. Kohlmeier
and/or Employees
Work completed for various Towns,
Villages, Counties, Agricultures, Municipalities, State and Federal
Agencies. List of Engineers, phone numbers and contacts
Project References List
In Progress
Miscellaneous Projects 2024
Wells, pumps, well rehabilitation,
acidization w/HCL, Acidization W/Co2, PWS Wells, Monitor Wells, MITs,
Geophysical Logging, ASR Wells, Irrigation Wells, Well Abandonment and all
phases of the water well industry.
Lee County
City of Arcadia
Collier County
Sarasota county
Charolette County
Army Corps
SFWMD
SWFWMD
City of Venice/Andrews Sitework
Start February 2024
Set 40-feet of 34-inch steel casing & cement in place
Drill pilot hole to 140-feet
Conduct geophysical logging
Ream hole to 32-inch
Set 140-feet of 24-inch steel & cement in place
Drill pilot hole to 250-feet
Geophysical logging
Ream hole to 250-feet
Set 250-feet of 14-inch SDR-17 Well casing
Cement in place
Drill bottom borehole by reverse air to 333-feet BLS
Air & pump development
Pump test
Set final pump
Gateway Services District Start
February 2024
Build
Road & Pad
Set 40-feet of 34-inch steel & grout in place
Drill pilot hole with mud to 240-feet
Geophysical Logging
Ream hole to 240-feet
Set 240-feet of 24-inch steel & grout in place
Pilot hole to 700-feet
Geophysical logging
Ream hole to 24-inch & log well
Set 700-feet of 14-inch SDR 17
Cement in Place
Drill by reverse air to 850-feet BLS
Conduct Geophysical Logging with Video
Pump test
Install permanent Pump
Pine Island Fish Farm 50% Complete
RMA Geologic Consulting
Drill One Deep Salt Water Well
Set
60-feet of 26-inch Steel
Drill
25-inch borehole to 620-feet BLS
Set
610-feet of 16-inch steel
Pilot
hole to 1,900-feet BLS
Ream hole to 15-inches Reverse Air
Set 1,600-feet of 8-inch FRP well casing
Cement in Place
Drill bottom borehole to 1,900-feet by reverse air
Develop Well
Miscellaneous Projects 2023
Completed
·
16-inch Fire
Well South Naples
·
16-inch Fire
Well SE Naples
·
Well
Rehabilitation Projects in SW Florida
The Colony Golf Course 2023
Completed
·
Drill one six
inch Screened well
·
Develop Well
·
Install Pump
Bonita Springs Utilities in
Progress Phase 3 Through 2023
·
Drill 12 Wells
95% Complete
·
Set 20-feet of
34-inch surface casings
·
Pilot hole to
150-feet BLS
·
Geophysical
Logging
·
Ream hole to
32-inches
·
Geophysical
Logging
·
Set 26-inch
.375 steel casing & cement in place
·
12-inch pilot
hole to 820-feet BLS
·
Geophysical
logging
·
Ream hole to
25-inches to 820-feet BLS
·
Geophysical
logging
·
Set 16-inch
SDR-17 PVC well casing
·
Cement in place
with 1,200 sacks of cement
·
Drill to
1,100-feet BLS by Reverse Air Drilling Method
·
Conduct
Pre-Acid Step Test
·
Acidize wells
·
Conduct Post
Acid Step Pump Test
·
Disinfect and
Bacterial Samples
Collier County November 2022
Well Acidification & Well
Rehabilitation of Six Wells
·
Remove owner’s
pump
·
Conduct
pre-pump test
·
Suppress flow
with salt
·
Install acid
line
·
Pump Acid
·
Remove acid
lines
·
Air develop
·
Pump develop
·
Post step pump
test
·
Disinfect
·
Re-install
owners pump
·
Bactee samples
2022
Water Science /Army Corp of
Engineers Monitoring Wells CERP Indian River
Contact Rahul John On Hold
·
Lagoon South
C-23/24 Canal
·
Plug and
abandon 9/wells
·
Drill 9/new wells
2022
Water Science Marco Island Marco
Marriott
Contact Andy McThenia
·
Plug and
abandon one injection well
·
one supply well and one monitor well
2022
Bonita Springs Utilities
Contact Omar Rodriguez
·
Drill 9/wells
with 32-inch surface casing,
·
24-inch
intermediate casing
·
800-feet of
SDR-17 Certa-Lok PVC casing
·
drilled to a depth of 1,100-feet
·
packer test,
pump test and acidification
2022 Florida Design Drilling South
Florida Water Management District
·
Drill 24-inch
diameter well to approximately 1,100 feet deep.
·
Packer test,
·
Cores, pump
test & Lab analysis
2021
SFWMD
Completed
Monitor Well
·
50-feet of 12-inch
surface casing
·
325-feet of final casing
·
Drilled to 475-feet BLS
·
Developing & Testing
2021
WSA Consulting City of Naples
Completed
Andy McThenia Kirk Martin 239-246-1972
·
4-Well Co2
Rehabilitation
·
Pre-pump Test
·
Remove pump & Piping
·
Install well acid header
and trimmie line
·
Install 4,000 pounds of
Co2 over 80-hour period
·
Develop Well
·
Reinstall pump and
piping
·
Conduct post test
·
Video well before &
after treatment
2021
Island Water Association WSA Consulting Well H-10
Completed
Andy McThenia 239-246-1972
·
Pre-Pump Test
·
600-Foot Deep
10-inch Well
·
Remove Pump
·
Install
Inflatable Packer
·
Install Acid
Header and Trimmie Line
·
Install High
Strength HCL 32%
·
Remove Spent
Acid
·
Develop well
·
Reinstall
pump & Piping
·
Post Test
2021
City of Cape Coral
Completed
Public Water Supply Well
RMA Geologic Consulting
·
30-inch Bore-hole
·
24-inch surface casing
·
12-inch final casing
·
800-Feet Deep
·
Testing
·
Acidization w/packer
2020
Collier County
Project: Emergency Well Abandonment
Contact:
Pamela Libby
·
6 inch Artesian Well 460
feet dept
·
Install trimming lime to
460 feet below land surface
·
Cement from bottom to
land surface
2020
Collier County Phase 4A
Project: Two 16 Inch Wells 800 feet deep Water Supply Wells
Contact:
Tom Sivert
(239) 252-8407 WSA Andy McThenia 239-246-1972
·
Pre and Post Pump test
·
Install Acid well head
and tubing,
·
HCI well Acidifications
·
Public Water Supply Well
·
Pull and replace Pumps
·
Pre-Post Pump Test
·
Air and Pump Development
·
Bacteriological
Sampling
2021
Collier County Phase 4
Project: Well and Pump Repair-
Acidification of 12-Wells Public water Supply Wells GG Wellfield
Contact: Tom
Sivert (239) 252-8407
WSA Consultants Andy McThenia 239-246-1972
·
Acidification
of 12 Wells
·
Public Water Supply Well
·
Pull and replace Pumps
12
·
Pre-Post Pump Test
·
Install Acid well head
and tubing,
·
Installed CO2 or HCI
·
Air and Pump Development
·
Bacteriological
Sampling
2020
Island Water Association Sanibel Island FL. Well H-14
·
Acidification of Deep
well
·
PWS
·
Pump Test Development
·
Install New Pump
2020 Island Water Association Well
10 Pipe Rep
·
Well Head repair
·
316 Stainless steal
Piping and Fittings
·
Acidification of Deep
well (scheduled for 2021)
·
Public Water Supply
2020
Collier County 12
Contact: Mitchell Stark-Michael Westhafer
(239) 332-1632
·
Well B plug and Well
Abandonment
·
Pump Removal and
Reinstalling Well Heads
·
Trimmer line, Slab-
Electric
2020
Collier County
Project: Well 39
Contact:
Mitchell Stark – Michael Westhafer
(239) 332-1632
·
Install new 12 inc Fiber
glass Production well
·
Air and Pump Development
·
Well Testing , Lab
Testing Primary and Secondary
2020
Colony Golf & Country Club
Project: Colony Submersible Pumps - 3rd phase
Contact: Jeff Price
·
Pump Removal and
Reinstalling 240 Volts 3 phase
·
Electric wire
–Accessioning
·
Restore - New valves
fittings
·
Run floats clean conduit
lines, Well Logging
2020
Collier County
Orange Tree Water Plant
Project: Wells B (Oil Well Road)
Contact: Mitchell Stark-Michael Westhafer
(239) 332-1632
·
Well B plug and Well
Abandonment
·
Pump Removal and
Reinstalling Well Heads
·
Trimmer line, Slab-
Electric
2020
Collier County Orange Tree Water
Plant Public Utilities
Contract: 15-6469
Project: Wells A, B, E
Contact: Management and Planning Div.-Tom Sivert (239) 252-5376
·
Acidification
Production Wells
·
Well Rehabilitation
·
Pump Removal and
Reinstalling Well Heads
·
Well Air Develop
·
Estep Test Conduit,
Restore - New Piping- Pump
Testing
2020
County Board of Commissioners
Contract: 18-7483
Project: SCWRF Blowers Collier
Contact: Matt Casey
mcasey@qeusa.com Quality Enterprise
·
Well Rehabilitation
·
Pump Removal and
Reinstalling Well Heads
·
Well Air Develop
·
Air Blower Replacement
·
New piping
2019
Collier County
City of Golden Gate Well Abandonment
Project Number: 15-6469
Contact: Dustin Grossenbaugh (239) 465-1402
·
Well Abandonment
·
8 inch Production wells
·
16 inch Production Wells
·
Well Logging
·
Video Logs
·
Well depths from 20 feet
to 250 feet
·
Total Well Abandonment
21 wells
2019
Collier County
Golden Gate Wellfield 3nd Phase
Project Number: 70085.19.2
Contact: Joshua BauerJoshua.Bauer@colliercountyfl.gov
(239) 252-6245
·
Acidification
of 12 Production Wells
·
Well Rehabilitation
·
Pump Removal and
Reinstalling Well Heads
·
Well Air Develop
·
Restore - New Piping- Pump Testing
·
Well Logging
2019
South Florida Water Management District
Palm Bay / Okeechobee
Project Wellhead Repair of PBF-7
·
2,040 feet deep dual
zone Monitor well
·
Project Manager Keith
Smith 561-682-6804
·
Salt Down
both zones deep high pressure zones
·
Replace wellhead,
valves, concrete & fence
·
Bring the dual zones
back
·
Take out old steel and
replace with Stainless Steel
2019
Cape Coral
Project: 8 Monitor Wells
Contact: Jeff Pearson City of Cape Coral 239 574-0709
239 415-1818 Cape Coral RE
Division
·
Drill 4 inch Monitor
Wells
·
Well Air Develop
·
New Piping-
Pump Testing
2019
Collier County
2018 Project: Golden
Gate Wellfield 2nd Phase Collier County
Contact:
W. Kirk Martin, P.G. 239.204.5301
239.218.1043
kirk@wsaconsult.com
Joshua Bauer
Joshua.Bauer@colliercountyfl.gov
·
Acidizing 8
Production Wells
·
Well Rehabilitation
·
Pump Removal and
Reinstalling Well Heads
·
Restore - New Piping
·
Pump Testing
2018
Collier County
2017
Project: SRO Project
Contact: Project Mng. Matt Casey 239-633-0555 Quality Enterprises
·
Salt Down Deep Flowing
Wells (New Valves, Backflow, Gaskets)
·
Bolts (spacers, spool
pieces)
·
Remove Salt & Bacterial
Clearances
2019
Collier County
2018
Project: Mule Penn Wellfield Improvement-Collier County
Contact: John H Eick
·
Replace 6 pumps, piping
·
Replace and repair
piping
·
Electrical improvements
·
Instrumentation and
controls
2019
Collier County
2018
Project: Golden Gate Wellfield Testing Maintenance
Contact: W. Kirk Martin, P.G. 239.204.5301 – 239.218.1043
kirk@wsaconsult.com
Joshua Bauer
Joshua.Bauer@colliercountyfl.gov
·
Acidizing
2 Deep Production Wells
·
Well Air Test
·
Well Rehabilitation
·
Pump Removal and
Reinstalling Well Heads
·
Restore - New Piping
·
Pump Testing Well
2018
Sanibel Inland Well –IWA H-14
Contact: Andy McThenia 239-529- 4399
·
Well Rehabilitation
·
Pump Removal
Well Heads Reinstallation
·
Well acidizing
·
Restore
New Piping and Site Cleaning
·
Conduct Specific
Capacity
·
Drawdown Test Pump Development
2018
Old Collier County
Project: Old Collier Golf Club Well LH-1 Ac Rehab
Contact: Water Science Associates - Kurt Martin
·
Well Rehabilitation
·
Pump Removal and
·
Reinstalling Well Heads
·
Well Acidizing, Site
Restoration
·
Conduct Specific
Capacity
·
Drawdown Test Pump Development
2018
Collier County- Well Rehabilitation
Project: NESA Orange Tree
Contact: Swainson, Hall, Proc Mng.
239-252-8932 and 252-6334
·
Well Rehabilitation
Develop Open Hole
·
Conduct Specific
Capacity and Steps Drawdown Test
·
Pump Development and
Reinstallation
·
Disconnection and Assist
in Bacteriological Clearance
2018
Colony Country Club
Project: Well Rehabilitation Project
Contact: Jeff, Price Project Manager 239 278-1177
·
Drill Pilot Hole
·
Well Development
·
Drill and Install 16
inch Casing
·
Air Develop
·
Conduct Specific
Capacity and Steps Drawdown Test
·
Piping
- Installation of New
Electric Boxes
2018
Bonita Springs Utilities
Project: Well Rehabilitation Project
·
Salt Down 6 Wells
·
Installation of New
Pumps
·
Well Development
Well Abandonment and Well Rehabilitation Projects Competed by
Wells &Water Systems, Inc.
Robert J. Kohlmeier
and/or Employees
Bonded Job as a Prime Contractor:
Ø
South Florida Water
Management District
Ø
City of Cape Coral
Ø
City of Fort Myers
Ø
Lee County (cleaning and
abandonment of an old Oil well approximately 2500 feet deep)
Ø
City of Ormond Beach
Ø
Verna Well Field ,
Sarasota (1,000 feet deep)
Ø
Sanibel Inland
Contractors:
Ø
City of Cape Coral
Ø
City of Naples
Ø
Gulf Utilities
Ø
Harbor Heights Water
Associates
Ø
Indian Reservation
Ø
Ocean reef Club
Ø
Sanibel Island
Agriculture Work throughout Florida:
Ø
Alico Inc.
Ø
Baron Collier
Ø
Collier County
Ø
Dole Pinnacle
Ø
USDA
Ø
US Sugar
Additional information on others wells completed in
the last five years throughout the state of